|
01. |
Poor Value Perception |
|
02. |
Poor Safety Awareness |
|
03. |
Lack of Safety Measure |
|
04. |
Organizational Problems |
|
05. |
Poor Management |
|
06. |
Poor Management for Work |
|
07. |
Production |
|
08. |
Hardware Production |
|
09. |
Construction Work for Subway |
|
10. |
Open-cut method |
|
11. |
Suspension of Gas Pipe |
|
12. |
Regular Operation |
|
13. |
Nonobservance of Procedure |
|
14. |
No prevention against Drawing Off |
|
15. |
Malfunction |
|
16. |
Poor Hardware |
|
17. |
Decrease of Joint Strength |
|
18. |
Failure |
|
19. |
Fracture/Damage |
|
20. |
Drawn Off Joint for Drainer |
|
21. |
Secondary Damage |
|
22. |
External Damage |
|
23. |
Leak of Gas |
|
24. |
Explosion |
|
25. |
Bodily Harm |
|
26. |
Death |
|
27. |
Bodily Harm |
|
28. |
Injury |
|
29. |
Damage to Society |
|
30. |
Social Systems Failure |
|
31. |
Burned Down of Houses |
|
|
|
Gas Explosion at a Subway Construction Site
|
|