 |
01. |
Carelessness |
 |
02. |
Insufficient Understanding |
 |
03. |
No Connection of Thinking between Freezing Point and Condenser |
 |
04. |
Organizational Problems |
 |
05. |
Inflexible Management Structure |
 |
06. |
Insufficient Education/Training |
 |
07. |
Planning and Design |
 |
08. |
Poor Planning |
 |
09. |
Condenser Designed below Freezing Point |
 |
10. |
Non-Regular Action |
 |
11. |
Emergency Action |
 |
12. |
No Action at Abnormal temperature Rise |
 |
13. |
Bad Event |
 |
14. |
Mechanical Event |
 |
15. |
Plugging |
 |
16. |
Bad Event |
 |
17. |
Chemical Phenomenon |
 |
18. |
Abnormal Reaction |
 |
19. |
Secondary Damage |
 |
20. |
External Damage |
 |
21. |
Explosion |
 |
22. |
Loss to Organization |
 |
23. |
Economic Loss |
|
|
 |

Explosion of an o-nitrochlorobenzene melting drum caused due to a temperature rise caused by reflux piping blockage
|
 |
Knowledge Comment: |
 |
Solidification makes plugging in a tube. Careful consideration is required to condense for high freezing poit material. |
|
|
|
|