01. |
Poor Value Perception |
 |
02. |
Poor Safety Awareness |
 |
03. |
Insufficient Recognition of Risk |
 |
04. |
Organizational Problems |
 |
05. |
Poor Management |
 |
06. |
Slackness of Management |
 |
07. |
Planning and Design |
 |
08. |
Poor Planning |
 |
09. |
Insufficient Schedule Management at Shutdown |
 |
10. |
Non-Regular Operation |
 |
11. |
Change in Operation |
 |
12. |
Operation Differ from Direction |
 |
13. |
Failure |
 |
14. |
Deformation |
 |
15. |
Shrinkage of Piping/Heat Exchanger |
 |
16. |
Secondary Damage |
 |
17. |
External Damage |
 |
18. |
Fire |
|
|
 |

Leakage and fire of fuel oil from a flange between a heat exchanger and piping during shutdown operation at a vacuum gas oil hydrodesulfurization unit
|
 |
Knowledge Comment: |
 |
Metals must shrink at temperature dropping, so rapid temperature drop has to be avoided. |
|
|
|
|