|
01. |
Poor Value Perception |
|
02. |
Poor Safety Awareness |
|
03. |
Insufficient Safety Measure |
|
04. |
Insufficient Analysis or Research |
|
05. |
Insufficient Practice |
|
06. |
Lack of Imagination |
|
07. |
Halogenation Reaction |
|
08. |
Planning and Design |
|
09. |
Poor Planning |
|
10. |
Poor Design |
|
11. |
Non-Regular Operation |
|
12. |
Emergency Operation |
|
13. |
Opeartion accompanied with Machine Switching |
|
14. |
Bad Event |
|
15. |
Chemical Phenomenon |
|
16. |
Abnormal Reaction |
|
17. |
Failure |
|
18. |
Large-Scale Damage |
|
19. |
Leakage |
|
20. |
Secondary Damage |
|
21. |
Damage to Environment |
|
22. |
Environmental Pollution |
|
|
|
Hydrogen chloride gas leakage from a reactor due to the pressure rise from an abnormal reaction at a chloroform manufacturing plant
|
|
Knowledge Comment: |
|
In an case of emergncy, a oprator may become panic. Automation of operation and training for emergency case are required for the countermeasures. |
|
|
|
|