01. |
Insufficient Analysis or Research |
 |
02. |
Insufficient Practice |
 |
03. |
Insufficient Image of Abnormal Situation |
 |
04. |
Poor Value Perception |
 |
05. |
Poor Safety Awareness |
 |
06. |
Inadequate Risk Recognition |
 |
07. |
Planning and Design |
 |
08. |
Poor Planning |
 |
09. |
Poor Design |
 |
10. |
Usage |
 |
11. |
Maintenance/Repair |
 |
12. |
Ibadequate Inspection |
 |
13. |
Failure |
 |
14. |
Abrasion |
 |
15. |
Erosion/Crack |
 |
16. |
Secondary Damage |
 |
17. |
External Damage |
 |
18. |
Explosion |
 |
19. |
Bodily Harm |
 |
20. |
Injury |
 |
21. |
5 person injured |
 |
22. |
Loss to Organization |
 |
23. |
Economic Loss |
 |
24. |
Direct Monetary Damage 40 million yen |
|
|
 |

Explosion caused due to leak of niter as a heating medium in the distillation drum at a phthalic anhydride manufacturing plant
|
 |
Knowledge Comment: |
 |
Two materials, which must react if the direct contact of the two occurrs, were separated by only one thin plate. Are there any countrmeasure? |
|
|
|
|