 |
01. |
Poor Value Perception |
 |
02. |
Poor Safety Awareness |
 |
03. |
Inadequate Risk Recognition |
 |
04. |
Carelessness |
 |
05. |
Insufficient Precaution |
 |
06. |
Carelessness of Operator |
 |
07. |
Planning and Design |
 |
08. |
Poor Planning |
 |
09. |
Poor Planning of Repair |
 |
10. |
Usage |
 |
11. |
Maintenance/Repair |
 |
12. |
Recovery |
 |
13. |
Malfunction |
 |
14. |
Poor Hardware |
 |
15. |
Poor Control System |
 |
16. |
Bad Event |
 |
17. |
Mechanical Event |
 |
18. |
Over Speed |
 |
19. |
Failure |
 |
20. |
Large-Scale Damage |
 |
21. |
Rapture |
 |
22. |
Secondary Damage |
 |
23. |
External Damage |
 |
24. |
Fire |
 |
25. |
Loss to Organization |
 |
26. |
Economic Loss |
 |
27. |
Direct Monetary Damage 1100 million yen |
|
|
 |

Leakage and fire of carbon monoxide caused due to breakage of a gas expander from over revolutions at a fluidized catalytic cracker unit
|
 |
Knowledge Comment: |
 |
Restoration of the important instrument for safety shoul be execued after sufficient examination. |
|
|
|
|