|
01. |
Insufficient Analysis or Research |
|
02. |
Insufficient Practice |
|
03. |
Lack of Imagination |
|
04. |
Poor Value Perception |
|
05. |
Poor Safety Awareness |
|
06. |
Inseufficient safety measure |
|
07. |
Planning and Design |
|
08. |
Poor Planning |
|
09. |
Poor Design |
|
10. |
Usage |
|
11. |
Maintenance/Repair |
|
12. |
Wrong heat insulation |
|
13. |
Failure |
|
14. |
Large-Scale Damage |
|
15. |
Leakage |
|
16. |
Secondary Damage |
|
17. |
External Damage |
|
18. |
Fire |
|
|
|
Fire of leaked oil from a heat exchanger caused due to slow action of an emergency cut-off valve at a fluidized catalytic cracking unit
|
|
Knowledge Comment: |
|
Remote control valve for emergency use must be reqired quick action. The required quickness is a function of the viscosity. |
|
|
|
|