Planning and Design |
 |
11. |
Poor Planning |
 |
12. |
Poor Construction Method Planning |
 |
13. |
Usage |
 |
14. |
Maintenance/Repair |
 |
15. |
Wrong Repair Method |
 |
16. |
Failure |
 |
17. |
Large-Scale Damage |
 |
18. |
Tank Breakage |
 |
19. |
Loss to Organization |
 |
20. |
Economic Loss |
 |
21. |
65000 kL Floating Tank Destructed Completely |
|
|
 |

Leakage of a newly constructed floating roof tank caused due to damage to a base plate during a water leak test
|
 |
Knowledge Comment: |
 |
Engineers compromised the repair work from schedule and budget. The result became the worst. |
|
|
|
|