01. |
Organizational Problems |
 |
02. |
Inflexible Management Structure |
 |
03. |
Insufficient Education/Training |
 |
04. |
Insufficient Analysis or Research |
 |
05. |
Insufficient Practice |
 |
06. |
Lack of Imagination |
 |
07. |
Planning and Design |
 |
08. |
Poor Planning |
 |
09. |
Bad Event |
 |
10. |
Chemical Phenomenon |
 |
11. |
Abnormal Reaction |
 |
12. |
Secondary Damage |
 |
13. |
External Damage |
 |
14. |
Explosion |
 |
15. |
Failure |
 |
16. |
Large-Scale Damage |
 |
17. |
Leakage |
 |
18. |
Secondary Damage |
 |
19. |
External Damage |
 |
20. |
Fire |
 |
21. |
Bodily Harm |
 |
22. |
Death |
 |
23. |
Bodily Harm |
 |
24. |
Injury |
 |
25. |
3 person injured |
 |
26. |
Loss to Organization |
 |
27. |
Economic Loss |
 |
28. |
Manetary Damage 1500 million yen |
 |
29. |
Damage to Society |
 |
30. |
Social Systems Failure |
 |
31. |
Big Blow to Semiconductor Manufacture |
|
|
 |

Explosion of a DMSO recovery drum caused due to foreign material contamination at an epoxy resin manufacturing plant
|
 |
Knowledge Comment: |
 |
If a contamination hazards was not foreseen at the basic design stage, it is very difficult to revise at the folliwing stage. |
|
|
|
|