01. |
Insufficient Analysis or Research |
 |
02. |
Insufficient Practice |
 |
03. |
Lack of Imagination |
 |
04. |
Organizational Problems |
 |
05. |
Poor Staff |
 |
06. |
Poor Experiment of Staff |
 |
07. |
Unknown Cause |
 |
08. |
Occurrence of Abnormal Phenomenon |
 |
09. |
Big Rain over Assumption |
 |
10. |
Planning and Design |
 |
11. |
Poor Planning |
 |
12. |
Poor Design |
 |
13. |
Bad Event |
 |
14. |
Thermo-Fluid Event |
 |
15. |
Thermal Schrinkage |
 |
16. |
Secondary Damage |
 |
17. |
External Damage |
 |
18. |
Leakage/Fire |
|
|
 |

Leakage and fire of hydrogen and gas oil mist from a flange at outlet piping of a reactor due to a heavy rain at a desulphurization plant
|
 |
Knowledge Comment: |
 |
Even if the small work like decision of location of weep-holes on a floor, which deciced at the construction site and at the last stage of consruction , the decision may be failed without experiences and good judgment. |
|
|
|
|