|
01. |
Insufficient Analysis or Research |
|
02. |
Insufficient Practice |
|
03. |
Lack of Imagination |
|
04. |
Organizational Problems |
|
05. |
Poor Staff |
|
06. |
Poor Experiment of Staff |
|
07. |
Unknown Cause |
|
08. |
Occurrence of Abnormal Phenomenon |
|
09. |
Big Rain over Assumption |
|
10. |
Planning and Design |
|
11. |
Poor Planning |
|
12. |
Poor Design |
|
13. |
Bad Event |
|
14. |
Thermo-Fluid Event |
|
15. |
Thermal Schrinkage |
|
16. |
Secondary Damage |
|
17. |
External Damage |
|
18. |
Leakage/Fire |
|
|
|
Leakage and fire of hydrogen and gas oil mist from a flange at outlet piping of a reactor due to a heavy rain at a desulphurization plant
|
|
Knowledge Comment: |
|
Even if the small work like decision of location of weep-holes on a floor, which deciced at the construction site and at the last stage of consruction , the decision may be failed without experiences and good judgment. |
|
|
|
|