![](../imgen/space.gif) |
01. |
Organizational Problems |
![](../imgen/space.gif) |
02. |
Poor Management |
![](../imgen/space.gif) |
03. |
Slackness of Management |
![](../imgen/space.gif) |
04. |
Poor Value Perception |
![](../imgen/space.gif) |
05. |
Poor Safety Awareness |
![](../imgen/space.gif) |
06. |
Poor Construction Management System |
![](../imgen/space.gif) |
07. |
Carelessness |
![](../imgen/space.gif) |
08. |
Insufficient Understanding |
![](../imgen/space.gif) |
09. |
Insufficient Recognition of Risk |
![](../imgen/space.gif) |
10. |
Planning and Design |
![](../imgen/space.gif) |
11. |
Poor Planning |
![](../imgen/space.gif) |
12. |
Poor Material Control Planning |
![](../imgen/space.gif) |
13. |
Production |
![](../imgen/space.gif) |
14. |
Hardware Production |
![](../imgen/space.gif) |
15. |
Piping Construction |
![](../imgen/space.gif) |
16. |
Failure |
![](../imgen/space.gif) |
17. |
Abrasion |
![](../imgen/space.gif) |
18. |
Corrosion |
![](../imgen/space.gif) |
19. |
Secondary Damage |
![](../imgen/space.gif) |
20. |
External Damage |
![](../imgen/space.gif) |
21. |
Leakage/Fire |
|
|
![](../imgen/space.gif) |
![](../dfen/DC1200040.jpg)
Leakage and fire due to corrosion of branch piping for a thermometer of an atmospheric distillation unit
|
![](../imgen/list_b.gif) |
Knowledge Comment: |
![](../imgen/space.gif) |
It is essential to establish the system where an error does not occurr when large amount of objects is handled like a construction. |
|
|
|
|