01. |
Organizational Problems |
 |
02. |
Poor Management |
 |
03. |
Poor Operation Management |
 |
04. |
Poor Value Perception |
 |
05. |
Poor Safety Awareness |
 |
06. |
Inadequate Risk Recognition |
 |
07. |
Carelessness |
 |
08. |
Insufficient Precaution |
 |
09. |
Mannerism |
 |
10. |
Planning and Design |
 |
11. |
Poor Planning |
 |
12. |
Poor Planning of Repair |
 |
13. |
Usage |
 |
14. |
Maintenance/Repair |
 |
15. |
Hot Bolting |
 |
16. |
Malfunction |
 |
17. |
Poor Hardware |
 |
18. |
Insufficient Tightening Force |
 |
19. |
Secondary Damage |
 |
20. |
External Damage |
 |
21. |
Leakage/Fire |
|
|
 |

Leakage and fire from a reactor flange during shutdown operation at a hydrogenation plant of pyrolysis gasoline
|
 |
Knowledge Comment: |
 |
Insufficient tightening force at the start-up operation leads the result of temperature decreasing work at shutdown operation. It is important to execute the quantative control of the tightening force. |
|
|
|
|