 |
01. |
Poor Value Perception |
 |
02. |
Poor Safety Awareness |
 |
03. |
Regular Operation |
 |
04. |
Nonobservance of Procedure |
 |
05. |
Malfunction |
 |
06. |
Specifications Not Met |
 |
07. |
Possible Damage |
 |
08. |
Potential Hazard |
|
|
 |

The result which underdrain construction didn't achieve the purposes of the construction since it was remarkably different from the design.
|
|