Scenario

01. Ignorance of Procedure
02. Disregard of Procedure
03. Misjudgment
04. Misperception
05. Insufficient Analysis or Research
06. Insufficient Prior Research
07. Poor Concept
08. Poor Strategy or Concept
09. Organizational Problems
10. Inflexible Management Structure
11. Organizational Problems
12. Poor Management
13. Usage
14. Maintenance/Repair
15. Regular Operation
16. Erroneous Operation
17. Failure
18. Fracture/Damage
19. Loss to Organization
20. Economic Loss
21. Loss to Organization
22. Social Loss

Hot water overflowed from the supply piping, and the corridor and the dining room flooded.
Case Details


Field Civil Engineering
Author Fujimoto Masaru (KUMAGAI GUMI Co., Ltd.)