01. |
Unknown Cause |
 |
02. |
Occurrence of Unknown Phenomenon |
 |
03. |
Heat Pipe phenomenon of branch piping of the line stopping |
 |
04. |
Planning and Design |
 |
05. |
Poor Planning |
 |
06. |
The rise in heat of the by-pass piping is not forecast. |
 |
07. |
Application of improper structure to by-pass piping |
 |
08. |
Failure |
 |
09. |
Fracture/Damage |
 |
10. |
Hydrogen attack of by-pass piping and leakage of process fluid |
 |
11. |
Failure |
 |
12. |
Large-Scale Damage |
 |
13. |
Burst of by-pass piping |
 |
14. |
A large amount of gush of process fluid including hydrogen |
 |
15. |
Misjudgment |
 |
16. |
Misjudgment of Situation |
 |
17. |
Correspondence to leakage event |
 |
18. |
Secondary Damage |
 |
19. |
External Damage |
 |
20. |
Fire |
 |
21. |
Bodily Harm |
 |
22. |
Death |
 |
23. |
Accidental death |
 |
24. |
Loss to Organization |
 |
25. |
Economic Loss |
 |
26. |
Damage to Plant Unit |
|
|
 |

Burst by Hydrogen attack of Residue Hydrodesulfurization Unit Piping
|
|